MI325X is an AMD GPU built on CDNA 3 that was launched on October 10, 2024 and will be in production in 4Q2024.1

It is positioned to compete against H200 and, just as H200 was a memory bump to H100, MI325X is a memory bump to MI300X. However, MI325X also has a 1000 W maximum power, whereas MI300X was 750 W maximum.

Specifications

Each MI325X GPU has:2

  • 8 XCDs
  • 256 GB HBM3E (8 stacks?)1
    • 6 TB/s (max)
  • 7 AMD Infinity Fabric (D2D)3
  • 1 PCIe Gen5 (H2D)3
  • 1000 W maximum (TBP)

Its compute subsystem (XCDs and below) appear identical to MI300X, but its memory subsystem is upgraded to HBM3E. It is also specified at 1000 W TBP instead of 750 W.

Performance

The launch advertised 1.3 PF of FP16 and 2.6 PF of FP8.1 This appears to be the same as MI300X.

The following are theoretical maximum performance in TFLOPS:2

Data TypeVFMAMatrixSparse
FP6481.7163.4
FP32164.4163.4
TF32653.71307.4
FP161307.42614.9
BF161307.42614.9
FP82614.95229.8
INT32
INT82614.95229.8

Footnotes

  1. https://x.com/patrickmoorhead/status/1844415678918603090?s=46&t=UheQB0-0TrbsB2KvmT7aWQ 2 3

  2. AMD Instinct™ MI325X Accelerators 2

  3. The AMD spec page says there are 8 Infinity Fabric links and the GPU supports PCIe Gen5, but it doesn’t specify how those are related. However, the MI300X spec says there are 7x16 Infinity Fabric links and 1x16 PCIe Gen5, so I assume MI325X is the same. 2